Production > 05N
Part number | Manufacturer | Description | Availability | Price VAT not included | ||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
05N03L | INFINEON | 00+ | available 20 pc(s) ![]() lead time 14-28 days | |||||||||
05N03L | available 1095 pc(s) ![]() lead time 14-28 days | |||||||||||
05N03LA | INFINEON | 09+ TO252-2.5 | available 2424 pc(s) ![]() lead time 14-28 days | |||||||||
05N1034(80/M) | - | Material: BT-R80 Thermostats | available 4 pc(s) ![]() lead time 7-14 days |
| ||||||||
05N1034(80/M) | - | Material: BT-R80 Thermostats | available 4 pc(s) ![]() lead time 21-30 days |
| ||||||||
05NR-D4K-P | J.S.T. Deutschland GmbH | DISCONNECTABLE INSULATION DISPLACEMENT CONNECTORS | out of stock | |||||||||
05NR-E4K(LF) | JST | Material: 05NR-E4K Raster signal connectors 2,50mm | available 500 pc(s) ![]() lead time 7-14 days |
| ||||||||
05NR-E4K(LF) | JST | Material: 05NR-E4K Raster signal connectors 2,50mm | available 500 pc(s) ![]() lead time 21-30 days |
| ||||||||
05NR-E6S(LF) | J.S.T. Deutschland GmbH | Conn IDC Connector RCP 5 POS 2.5mm IDT RA Cable Mount Box | out of stock | |||||||||
05NU42 | TOSHIBA | available 3000 pc(s) ![]() lead time 14-28 days |