Production > 39C

Part numberManufacturerDescriptionAvailabilityPrice VAT not included
39C1008-1Grayhill Inc.Description: HARDWARE NUT 8-40 UNS-2Aavailable 65 pc(s)
lead time 21-31 days
18+ 15.61 UAH
19+ 14.38 UAH
25+ 14.09 UAH
50+ 12.94 UAH
39C1008-1GrayhillSwitch Hardware NUT,8-40,BR,NONE,218,062available 648 pc(s)
lead time 14-21 days
39C1008-1GrayhillSwitch Accessories, Nut 8-40 Uns-2Aavailable 25 pc(s)
lead time 21-31 days
39C1008-2GrayhillSwitch Hardware NUT,8-40,BR,COP,218,062 02775out of stock
39C1008-2Grayhill Inc.Description: NUT 8-40 BR COP 218 062 02775out of stock
39C705ADDIPavailable 130 pc(s)
lead time 14-28 days
39C705AD89available 130 pc(s)
lead time 14-28 days