Production > 5N2
Part number | Manufacturer | Description | Availability | Price VAT not included | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
5N20 | N/A | available 900 pc(s) ![]() lead time 14-28 days | ||||||||||||
5N20 | KEXIN | 09+ | available 49912 pc(s) ![]() lead time 14-28 days | |||||||||||
5N20 | PH | 09+ | available 5030 pc(s) ![]() lead time 14-28 days | |||||||||||
5N20 | available 1080 pc(s) ![]() lead time 14-28 days | |||||||||||||
5N2008 | HITACHI | available 2500 pc(s) ![]() lead time 14-28 days | ||||||||||||
5N20A | Goford Semiconductor | Description: N200V,RD(MAX)<650M@10V,VTH1V~3V, Packaging: Tape & Reel (TR) Package / Case: TO-252-3, DPak (2 Leads + Tab), SC-63 Mounting Type: Surface Mount Operating Temperature: -55°C ~ 150°C (TJ) Technology: MOSFET (Metal Oxide) FET Type: N-Channel Current - Continuous Drain (Id) @ 25°C: 5A Rds On (Max) @ Id, Vgs: 650mOhm @ 2.5A, 10V Power Dissipation (Max): 78W Vgs(th) (Max) @ Id: 3V @ 250µA Supplier Device Package: TO-252 (DPAK) Part Status: Active Vgs (Max): ±20V Drain to Source Voltage (Vdss): 200 V Gate Charge (Qg) (Max) @ Vgs: 10.8 nC @ 10 V Input Capacitance (Ciss) (Max) @ Vds: 255 pF @ 25 V | available 25000 pc(s) ![]() lead time 21-31 days |
| ||||||||||
5N20A | Goford Semiconductor | Description: N200V,RD(MAX)<650M@10V,VTH1V~3V, Packaging: Cut Tape (CT) Package / Case: TO-252-3, DPak (2 Leads + Tab), SC-63 Mounting Type: Surface Mount Operating Temperature: -55°C ~ 150°C (TJ) Technology: MOSFET (Metal Oxide) FET Type: N-Channel Current - Continuous Drain (Id) @ 25°C: 5A Rds On (Max) @ Id, Vgs: 650mOhm @ 2.5A, 10V Power Dissipation (Max): 78W Vgs(th) (Max) @ Id: 3V @ 250µA Supplier Device Package: TO-252 (DPAK) Part Status: Active Vgs (Max): ±20V Drain to Source Voltage (Vdss): 200 V Gate Charge (Qg) (Max) @ Vgs: 10.8 nC @ 10 V Input Capacitance (Ciss) (Max) @ Vds: 255 pF @ 25 V | available 28977 pc(s) ![]() lead time 21-31 days |
| ||||||||||
5N20A | GOFORD Semiconductor | Fast Switching MOSFET | available 25000 pc(s) ![]() lead time 21-31 days |
| ||||||||||
5N20A | Goford Semiconductor | Description: N200V,RD(MAX)<650M@10V,VTH1V~3V, Packaging: Tape & Reel (TR) Package / Case: TO-252-3, DPak (2 Leads + Tab), SC-63 Mounting Type: Surface Mount Operating Temperature: -55°C ~ 150°C (TJ) Technology: MOSFET (Metal Oxide) FET Type: N-Channel Current - Continuous Drain (Id) @ 25°C: 5A Rds On (Max) @ Id, Vgs: 650mOhm @ 2.5A, 10V Power Dissipation (Max): 78W Vgs(th) (Max) @ Id: 3V @ 250µA Supplier Device Package: TO-252 (DPAK) Part Status: Active Vgs (Max): ±20V Drain to Source Voltage (Vdss): 200 V Gate Charge (Qg) (Max) @ Vgs: 10.8 nC @ 10 V Input Capacitance (Ciss) (Max) @ Vds: 255 pF @ 25 V | available 2500 pc(s) ![]() lead time 21-31 days |
| ||||||||||
5N20F33K | J.W. Winco | Description: ADJ LEVER PLASTIC, STEEL M5 | available 30 pc(s) ![]() lead time 21-31 days | |||||||||||
5N20F33O | J.W. Winco | Description: ADJ LEVER PLASTIC, STEEL M5 | available 30 pc(s) ![]() lead time 21-31 days | |||||||||||
5N20F50 | J.W. Winco | Description: STEEL KNURLED THUMB SCREW | available 80 pc(s) ![]() lead time 21-31 days | |||||||||||
5N20V | KEXIN | 09+ | available 5156 pc(s) ![]() lead time 14-28 days | |||||||||||
5N20V | ST | 05+ TSSOP8 | available 308 pc(s) ![]() lead time 14-28 days | |||||||||||
5N20V | 09+ | available 42860 pc(s) ![]() lead time 14-28 days | ||||||||||||
5N20V | N/A | available 3930 pc(s) ![]() lead time 14-28 days | ||||||||||||
5N20V | ST | TSSOP-8 | available 970 pc(s) ![]() lead time 14-28 days | |||||||||||
5N20V | available 43560 pc(s) ![]() lead time 14-28 days | |||||||||||||
5N2305 | TO220/ | available 30 pc(s) ![]() lead time 14-28 days | ||||||||||||
5N25A20K | J.W. Winco | Description: ADJ LEVER ZINC DIE-CAST, S.S. | available 30 pc(s) ![]() lead time 21-31 days | |||||||||||
5N25P04 | J.W. Winco | Description: STAINLESS KNURLED THUMB SCREW | available 30 pc(s) ![]() lead time 21-31 days |