НазваВиробникІнформаціяДоступністьЦіна без ПДВ
SJH2K-03WLBJAMDescription: 2 MM W TO B CONNECTOR 3P WAFER A
Packaging: Bulk
Features: Board Guide
Connector Type: Header
Voltage Rating: 250VAC/DC
Current Rating (Amps): 3A
Mounting Type: Through Hole, Right Angle
Number of Positions: 3
Number of Rows: 1
Style: Board to Cable/Wire
Operating Temperature: -40°C ~ 85°C
Contact Type: Male Pin
Fastening Type: Latch Holder
Number of Positions Loaded: All
Termination: Press-Fit, Solder
Material Flammability Rating: UL94 V-0
Contact Material: Brass
Insulation Color: White
Pitch - Mating: 0.079" (2.00mm)
Contact Finish - Mating: Tin
Contact Finish - Post: Tin
Part Status: Active
Contact Shape: Square
Contact Length - Post: 0.122" (3.10mm)
Insulation Height: 0.228" (5.80mm)
Shrouding: Shrouded - 4 Wall
Insulation Material: Polyamide (PA66), Nylon 6/6
на замовлення 1000 шт:
термін постачання 21-31 дні (днів)
20+14.37 грн
24+ 11.76 грн
27+ 10.46 грн
50+ 9.14 грн
100+ 8.49 грн
250+ 7.52 грн
500+ 7.07 грн
1000+ 5.79 грн
Мінімальне замовлення: 20
SJH2K-03WSBJAMDescription: 2 MM W TO B CONNECTOR 3P WAFER S
Features: Board Guide
Packaging: Bulk
Connector Type: Header
Voltage Rating: 250VAC/DC
Current Rating (Amps): 3A
Mounting Type: Through Hole
Number of Positions: 3
Number of Rows: 1
Style: Board to Cable/Wire
Operating Temperature: -40°C ~ 85°C
Contact Type: Male Pin
Fastening Type: Latch Holder
Number of Positions Loaded: All
Termination: Press-Fit, Solder
Material Flammability Rating: UL94 V-0
Contact Material: Brass
Insulation Color: White
Pitch - Mating: 0.079" (2.00mm)
Contact Finish - Mating: Tin
Contact Finish - Post: Tin
Contact Shape: Square
Contact Length - Post: 0.122" (3.10mm)
Insulation Height: 0.264" (6.70mm)
Shrouding: Shrouded - 4 Wall
Insulation Material: Polyamide (PA66), Nylon 6/6
на замовлення 1988 шт:
термін постачання 21-31 дні (днів)
23+12.93 грн
25+ 11.07 грн
29+ 9.83 грн
50+ 8.58 грн
100+ 7.98 грн
250+ 7.06 грн
500+ 6.64 грн
1000+ 5.43 грн
Мінімальне замовлення: 23
SJHS010-RC
на замовлення 950 шт:
термін постачання 14-28 дні (днів)